Our Projects

IBM

IBM Egypt has continued to put trust in our solutions for 4 consecutive projects from 2014 till today. By the end of the 4th project, IBM’s 2 Headquarters in Smart Village, Giza have become fully automated by our solutions, all 4 projects containing around 1500 of our devices.

Our Energy Management Systems includes control over:

1- Lighting: Control over all lighting whether on/off, DALI Dimming, or DMX RGB Lights. Application of Daylight harvesting (constant LUX function) in areas with sunlight access.
2- HVAC: Control over all Fan Coil Units and VAV (Variable Air Volume Dampers) in all closed areas and open areas.
3- Shades: Control over motorized shades in selective areas.
4- Audio Systems: Fully compatible with the automation system.

Control is done through:

1- Customized Smart Keypads for individual Room Control.
2- Over 400 pcs of our signature 12-in-1 multi-function sensors. These sensors save up space and cost by including motion, presence, light and temperature sensors all-in-one! These sensors are responsible for optimizing Lighting and HVAC usage, and eliminating human error.
3- Centralized monitoring and controlling stations.

Azadea

After our debut in Zara - Mall of Arabia Branch, this time we strike with 8 shops at once! We have completed the installation and commissioning of 8 projects in Open Air Mall Madinaty. The shops are: Zara - Zara Home - Massimo Dutti - Bershka - Pull & Bear - Stradivarius - Oysho - Lefties We couldn't be more proud of our team for completing such a project in record time.

National Bank of Egypt

We could not be happier with the latest addition to our extensive list of satisfied clients: The National Bank of Egypt - Nile Corniche Main Headquarters.
Thanks to unbelievable delivery duration from Zennio, our team of experts was able to handover the project within a matter of days.
The Customizable User Interface from ThinKnx ensures the modern user experience and smoothest operation.

Pharaonic Petroleum Company (PHPC)

Proud to partner with Pharaonic Petroleum Company (PhPC) in their new HQ in New Cairo to implement the ultimate Energy Saving and Management Solution!

Teaming up with Spectrum as our main Contractor and Petrojet as our Consultant, we are glad of the results we delivered both with high quality and in record time!

Our KNX Zennio International solution includes 150+ of Zennio’s Presencia Occupancy Detectors distributed among 8 floors to control the Lighting and A/C units in the whole building, ensuring no Light or A/C is turned on if a room is unoccupied and delivering the ultimate Energy Saving Solution.

Additionally, thanks to the amazing ThinKNX server, we are able to fully monitor and control the building, and produce consumption and occupancy reports per room, area and floor.

Marriot Hotel - Zamalek

Have we ever mentioned that Marriot Hotel is one of our biggest customers? Have we mentioned that we've made 8-No, 9 projects with Marriot Hotel before? We'll start bragging now. Here's the list:

1- Aida banquet.
2- Salon Vert banquet.
3- Salon Royal banquet.
4- Thebes banquet.
5- Memphis banquet.
6- Verdi banquet.
7- View banquet.
8- Elgezirah Tower Entrance.
9- Last but not least, the Tuscani Restaurant.
To top it all off, all 9 projects (the first one was 1999) have been maintenance free ever since installation.

Elite Hospital

Spanning a massive 32,000 sq. meters, Elite Hospital went for Energy Management Solutions to help optimize its huge energy bill. Applying the same model, we previously applied at IBM for a seamless experience that minimizes human error in energy utilization. We also offered special luxury solutions for Elite’s Royal Suites, for a more distinguished experience for its elite patients to feel right at home.

El Nasr for Housing and Development (NHD) Headquarters

4th Place Winner Out of 65 Commercial Project Worldwide
in KNX Awards Ceremony 2022

 

Saudi Arabia Embassy

Our solution to control the Lighting in the massive, ultimately luxurious, and beautiful Ceremonial Halls in the Saudi Arabian Embassy in Cairo, Egypt.
The Ceremonial Hall is divided into three halls, the separating walls can be retracted to make one massive hall. The system controls all the lighting in all halls, along with an integration made with an AMX system that controls the ceiling projectors and the motors controlling their ascent and descent. Control is made through an LCD wall-mount keypad, or a movable AMX touchpad.